MRT Phase 1
Project Details
- Location: Jakarta
- LOD : 300 - 350
- Data Resource : As-Built Drawing and the actual condition of structural, architectural, and MEP assets
- Year : 2024
The GeoBIM Indonesia team had the opportunity to 3D model the Jakarta MRT Phase 1 Asset for 6 months. The Jakarta MRT Phase 1 line starts from Lebak Bulus Terminal to Bundaran HI. Modeling is based on As-Built drawings and field documentation of structural, architectural, and MEP assets including station facilities, telecommunications, electrical systems, and others.
This work includes 13 station buildings along with rail lines, bridge structures, tunnel structures, high-voltage power lines, and other assets, with a Level of Detail (LOD) of 300. In addition to being a database and documentation of the MRT, the 3D model image equipped with digital asset information is expected to facilitate field inspections and facilitate asset renovation / restoration work.