Jalan Tol Cawang-Tomang-Pluit

Jalan Tol Cawang-Tomang-Pluit
The Cawang-Tomang-Pluit (CPT) Toll Road is a toll road part of the Jakarta Inner Ring Road (JIRR) which is connected to the Trans Jawa Toll Road. This toll road connects Cawang in Jakarta Timur with Pluit in Jakarta Utara.
The toll road with a length of 23,5 km was successfully modeled by the GeoBIM Indonesia Team with a Level of Detail (LOD) of 300 - 350. The modeling of the Cawang-Tomang-Pluit (CPT) Toll Road was carried out for 90 days, with objects modeled, which are 5,75 km elevated, 3 interchange points, 18 toll gates, 4 BUPs, 4 Underbridges, 32 overpasses. The CPT Toll Road Modeling is expected to be utilized as an asset inventory and toll road information development.
